Official announcements, company boilerplate, fact sheet and media assets. For interviews and inquiries, write to info@obsidiana.capital.

Anuncios oficiales, descripción corporativa, hoja de datos y recursos para medios. Para entrevistas y consultas, escriba a info@obsidiana.capital.

Press Release · Sept. 1, 2026 · George Town, Cayman IslandsComunicado de Prensa · 1 de septiembre de 2026 · George Town, Islas Caimán

As U.S. Data Center Approvals Stall, Obsidiana Capital Points Hyperscalers South

Ante el Freno a los Centros de Datos en EE. UU., Obsidiana Capital Apunta al Sur

With $130 billion in U.S. projects blocked in a single quarter, the company’s LNG-powered port site in Central America offers ~100 MW of permitted capacity with no interconnection queue

Con $130 mil millones en proyectos bloqueados en EE. UU. en un solo trimestre, el sitio portuario de la compañía en Centroamérica, alimentado con GNL, ofrece ~100 MW de capacidad permitida sin fila de interconexión

GEORGE TOWN, Cayman Islands, Sept. 1, 2026 — Obsidiana Capital Ltd. today said the narrowing path for data center construction in the United States is redrawing the map of AI infrastructure — and that its fully integrated “powered land” site at an established Atlantic deep-water port in Central America offers acquirers what U.S. markets increasingly cannot: capacity that can actually be built.

In the first quarter of 2026 alone, roughly 75 U.S. data center projects worth about $130 billion were blocked or delayed by local opposition — matching the total for all of 2025 — according to research firm Data Center Watch. Nearly 70 local governments have enacted moratoriums or bans, and an Ipsos survey found seven in ten Americans now oppose a data center near their homes, up from about half in late 2025. Where projects do advance, grid interconnection queues stretch to 72 months.

Other governments are moving the opposite way. Across Latin America, annual data center investment is projected to roughly double to $10 billion by 2029, and incentive regimes such as Brazil’s REDATA are competing openly for AI infrastructure. Obsidiana’s flagship site turns that welcome into delivery: approximately 100 MW of permitted, dedicated LNG-fueled, behind-the-meter generation capacity — island-mode or grid-connected, with generation equipment installed to the offtaker’s specification — on roughly 35 hectares (86 acres) of bay-front land with subsea fiber access, shovel-ready in under 12 months and independent of any interconnection queue.

“In the United States, the question has become whether you can build at all,” said Louis Ravenet, founding partner of Obsidiana Capital. “Our site was engineered for the opposite answer. The permits are secured, the land is entitled, the fuel arrives by sea — no queue, no moratorium, no referendum.”

The site is offered for turnkey handover, build-and-operate, or as an anchor partnership. Site identity, the technical data room and commercial terms are available under NDA. If you are a hyperscaler, an AI-infrastructure acquirer or a broker representing one — and your mandate is powered, shovel-ready capacity on an accelerated timeline — we should talk.

GEORGE TOWN, Islas Caimán, 1 de septiembre de 2026 — Obsidiana Capital Ltd. señaló hoy que el camino cada vez más estrecho para construir centros de datos en Estados Unidos está redibujando el mapa de la infraestructura de IA — y que su sitio de “terreno energizado” totalmente integrado, en un puerto de aguas profundas establecido del Atlántico en Centroamérica, ofrece a los adquirentes lo que los mercados estadounidenses cada vez menos pueden dar: capacidad que realmente se puede construir.

Tan solo en el primer trimestre de 2026, unos 75 proyectos de centros de datos en EE. UU., por un valor aproximado de $130 mil millones, fueron bloqueados o retrasados por oposición local — igualando el total de todo 2025 — según la firma de investigación Data Center Watch. Cerca de 70 gobiernos locales han promulgado moratorias o prohibiciones, y una encuesta de Ipsos halló que siete de cada diez estadounidenses se oponen hoy a un centro de datos cerca de su hogar, frente a cerca de la mitad a fines de 2025. Donde los proyectos sí avanzan, las filas de interconexión a la red llegan a 72 meses.

Otros gobiernos van en la dirección contraria. En América Latina, la inversión anual en centros de datos se proyecta que casi se duplique hasta $10 mil millones para 2029, y regímenes de incentivos como el REDATA de Brasil compiten abiertamente por la infraestructura de IA. El sitio insignia de Obsidiana convierte esa bienvenida en entrega: aproximadamente 100 MW de capacidad de generación dedicada a base de GNL, ya permitida, detrás del medidor — en isla o conectada a la red, con el equipo de generación instalado según la especificación del comprador de energía — sobre unas 35 hectáreas (86 acres) de terreno frente a la bahía con acceso a fibra submarina, listo para construir en menos de 12 meses e independiente de cualquier fila de interconexión.

“En Estados Unidos, la pregunta ya es si se puede construir siquiera”, dijo Louis Ravenet, socio fundador de Obsidiana Capital. “Nuestro sitio fue diseñado para la respuesta contraria. Los permisos están asegurados, el terreno está habilitado, el combustible llega por mar — sin fila, sin moratoria, sin referéndum.”

El sitio se ofrece para traspaso llave en mano, construcción y operación, o como una alianza ancla. La identidad del sitio, el cuarto de datos técnico y los términos comerciales están disponibles bajo acuerdo de confidencialidad. Si usted es un hiperescalador, un adquirente de infraestructura de IA o un intermediario que representa a uno — y su mandato es capacidad energizada y lista para construir en un cronograma acelerado — hablemos.

Download Release (PDF)Descargar Comunicado (PDF) Spanish Version (PDF)Versión en Español (PDF)
Press Release · Sept. 1, 2026 · George Town, Cayman IslandsComunicado de Prensa · 1 de septiembre de 2026 · George Town, Islas Caimán

Obsidiana Capital Unveils Central America’s First “Powered Land” Site for Hyperscale AI

Obsidiana Capital Presenta el Primer Sitio de “Terreno Energizado” para IA Hiperescala en Centroamérica

~100 MW of permitted, dedicated LNG-fueled generation capacity, bay-front land and subsea fiber in one shovel-ready package — delivered in under 12 months and offered for turnkey handover

~100 MW de capacidad de generación dedicada a base de GNL, ya permitida, terreno frente a la bahía y fibra submarina en un solo paquete listo para construir — entregado en menos de 12 meses y ofrecido para traspaso llave en mano

GEORGE TOWN, Cayman Islands, Sept. 1, 2026 — Obsidiana Capital Ltd. today announced a fully integrated, power-secured site for hyperscale AI/ML data centers at an established Atlantic deep-water port in Central America — believed to be the first of its kind in Central America, and the first in Central and South America to combine seaborne LNG supply, dedicated behind-the-meter generation and port-front land in a single package developed for turnkey handover to a private acquirer.

The site is fully permitted for approximately 100 MW of dedicated gas-fired generation — island-mode or grid-connected, with optional interconnection for surplus sales and backup — anchored by a hyperscale campus on roughly 35 hectares (86 acres) of bay-front land, an equal parcel under option. Generation equipment — reciprocating engines or turbines — is installed to the offtaker’s specification and at the offtaker’s request, so the end user, not the developer, decides the technology. LNG arrives by sea under a dedicated right-of-way; subsea cable landing access carries the compute to market. The package reaches shovel-ready condition in under 12 months, against grid interconnection queues that now stretch to 72 months in primary markets.

“The constraint on AI infrastructure is no longer chips — it is power,” said Louis Ravenet, founding partner of Obsidiana Capital. “What acquirers need is acreage with electrons, permits and fiber already attached. Nothing like this has been offered in the region before.”

The site is offered for turnkey handover, build-and-operate, or as an anchor partnership shaped to an acquirer’s specification. Obsidiana Capital unites three established firms — LNG Direct, Grupo Econoenergy, S.A. and QSC Logistics, S.A. — with more than 25 years of combined experience in power, fuels and strategic land.

Site identity, the technical data room and commercial terms are available under NDA. If you are a hyperscaler, an AI-infrastructure acquirer or a broker representing one — and your mandate is powered, shovel-ready capacity on an accelerated timeline — we should talk.

GEORGE TOWN, Islas Caimán, 1 de septiembre de 2026 — Obsidiana Capital Ltd. anunció hoy un sitio totalmente integrado y con energía asegurada para centros de datos hiperescala de IA/ML en un puerto de aguas profundas establecido del Atlántico en Centroamérica — considerado el primero de su tipo en Centroamérica, y el primero en Centro y Sudamérica en combinar suministro marítimo de GNL, generación dedicada detrás del medidor y terreno frente al puerto en un solo paquete desarrollado para traspaso llave en mano a un adquirente privado.

El sitio cuenta con todos los permisos para aproximadamente 100 MW de generación dedicada a gas — en isla o conectada a la red, con interconexión opcional para venta de excedentes y respaldo — anclado por un campus hiperescala en unas 35 hectáreas (86 acres) de terreno frente a la bahía, con una parcela igual bajo opción. El equipo de generación — motores reciprocantes o turbinas — se instala según la especificación y a solicitud del comprador de energía, de modo que es el usuario final, y no el desarrollador, quien decide la tecnología. El GNL llega por mar mediante una servidumbre dedicada; el acceso a amarre de cable submarino lleva el cómputo al mercado. El paquete alcanza condición lista para construir en menos de 12 meses, frente a filas de interconexión a la red que hoy llegan a 72 meses en los mercados principales.

“La restricción de la infraestructura de IA ya no son los chips — es la energía”, dijo Louis Ravenet, socio fundador de Obsidiana Capital. “Lo que los adquirentes necesitan es terreno con electrones, permisos y fibra ya incorporados. Nada como esto se había ofrecido antes en la región.”

El sitio se ofrece para traspaso llave en mano, construcción y operación, o como una alianza ancla configurada a la especificación del adquirente. Obsidiana Capital une a tres firmas establecidas — LNG Direct, Grupo Econoenergy, S.A. y QSC Logistics, S.A. — con más de 25 años de experiencia combinada en energía, combustibles y terrenos estratégicos.

La identidad del sitio, el cuarto de datos técnico y los términos comerciales están disponibles bajo acuerdo de confidencialidad. Si usted es un hiperescalador, un adquirente de infraestructura de IA o un intermediario que representa a uno — y su mandato es capacidad energizada y lista para construir en un cronograma acelerado — hablemos.

Download Release (PDF)Descargar Comunicado (PDF) Project Teaser (PDF) Teaser del Proyecto (PDF)

Fact SheetHoja de Datos

CompanyCompañíaObsidiana Capital Ltd. (Cayman Islands)
Joint ventureAlianzaLNG Direct · Grupo Econoenergy, S.A. · QSC Logistics, S.A.
GenerationGeneración~100 MW LNG-fueled, behind the meter — island-mode or grid-connected~100 MW a base de GNL, detrás del medidor — en isla o conectada a la red
LandTerreno~35 hectares (86 acres) bay-front; equal parcel under option~35 hectáreas (86 acres) frente a la bahía; parcela igual bajo opción
ConnectivityConectividadSubsea cable landing access; dedicated LNG right-of-wayAcceso a amarre de cable submarino; servidumbre dedicada de GNL
TimelineCronogramaShovel-ready in under 12 monthsListo para construir en menos de 12 meses
Delivery modelsModelos de entregaTurnkey handover · build-and-operate · anchor partnershipTraspaso llave en mano · construcción y operación · alianza ancla
LocationUbicaciónEstablished Atlantic deep-water port, Central America (identity under NDA)Puerto de aguas profundas establecido del Atlántico, Centroamérica (identidad bajo NDA)

About Obsidiana CapitalAcerca de Obsidiana Capital

Obsidiana — volcanic glass, forged where fire meets earth. Obsidiana Capital Ltd. (Cayman Islands) develops powered, shovel-ready ground for the age of AI: fully entitled, power-secured sites delivered as complete packages for handover, or built and operated with its own team.

Obsidiana — vidrio volcánico, forjado donde el fuego encuentra la tierra. Obsidiana Capital Ltd. (Islas Caimán) desarrolla terreno energizado y listo para construir para la era de la IA: sitios totalmente habilitados y con energía asegurada, entregados como paquetes completos para su traspaso, o construidos y operados con su propio equipo.

Media AssetsRecursos para Medios

Wordmark — SVG, print & screenLogotipo — SVG, impresión y pantalla

Download SVGDescargar SVG

Press ContactContacto de Prensa

info@obsidiana.capital  ·  obsidiana.capital